Home / Datacenter / Networking / Telecom / Case Study Sharing
MFocusing on high-density power demands in AI, HPC, and cloud infrastructure to boost power transmission efficiency and system reliability.
Through diverse plug specifications and customized configuration designs, it meets the power deployment needs of the global data center market.
Leveraging years of expertise in connectors, cable assembly, and custom cable design, JPC Connectivity introduces its AC Whip Cable solution fully compliant with OCP ORV3 standards. This solution not only helps customers accelerate data center deployment, but also provides a stable, reliable, and high-efficiency power connection tailored to the power demands of high-performance AI computing infrastructure.
To address the continuous rise in power consumption and rack power density driven by AI GPU servers, JPC’s ORV3 cables support high-current transmission up to 100A+, meeting the high-power supply requirements for next-generation AI servers and high-density racks.
Strict quality control is maintained throughout cable selection, precision crimping, and assembly processes, ensuring stable power delivery under high-current and heavy-load conditions while enhancing long-term operational reliability.
Designed in accordance with the OCP Open Rack V3 architecture, the cables can be seamlessly integrated into next-generation open rack and power shelf systems, helping customers simplify system integration and speed up deployment.
Supporting both IEC and NEMA standards, the solution caters to diverse power interface and application requirements across North America, Europe, and Asia, helping customers expand into global data center markets.
JPC ORV3 AC Whip Cable is widely deployed across high power computing and data center platforms, serving as a critical power foundation for data center equipment through stable, reliable connectivity solutions.
AI
Data Center
Hyperscale
Data Center
Cloud Computing
Infrastructure
Hyperscale Data
Center
Open Rack V3
System
Enterprise
Data Center
Edge Computing
Infrastructure
The rapid development of AI data centers is driving the upgrade and transformation of power architectures, which also brings new challenges:
To address these challenges, JPC provided a one-stop service from design and development to mass production:
JPC delivers more than just products—we are an essential partner helping customers build complete power connectivity solutions.